1. The universal installation and acceptance of shelves should ensure quality and safety, promote technological progress, and improve economic efficiency. This specification is formulated.
2. The installation of shelves should be carried out according to the drawings. When any discrepancies are found on site or in the design during construction, they should be promptly raised and approved for change before construction can proceed.
3. The various measuring and testing instruments, apparatus, meters, and equipment used in the installation of shelves shall comply with the current national metrological regulations, and their accuracy level shall not be lower than the accuracy level required for installation.
4. The concealed works before the installation of the shelves should be inspected and qualified before continuing construction.
5. Self inspection should be carried out during the installation of shelves.
6. The installation and construction of shelves shall comply with the current national (industry) standards and regulations, in addition to following this specification.
Precautions for shelf installation
Aug 16, 2024
Leave a message
